Completed in 2020, this specialty project consisted of relocating an existing 16 ton sculpture from Miromar Design Center to the new entry of Miromar Lakes Development Phase II. The project included the construction of the sculpture foundation with all integral electrical and plumbing systems, as well as the demolition of the existing base at Miromar Design Center. Extensive planning was performed to move the oversized structure five miles to its new location.
​